Rolled Roof vs Roof Covering Shingles vs Floor Tiles
https://www.multichain.com/qa/user/lyndancfxw
Only usage nails in the top 2 edges. Break a chalk line 35 1/2 inches over the eave. Position the first sheet, tack the top every 2 feet, as well as toenail the rake and also eave sides every 3 inches, maintaining